Construction

Brash Industries provides environmental compliance services to construction projects including all Construction General Permit (CGP) requirements, performed by a QSD/QSP:

  • Notice of Intent (NOI)
  • Risk Level Calculations and Recalculations
  • Storm water Pollution Prevention Plan (SWPPP) and Site Map
  • Change of Information (COI)
  • Rain Event Action Plan (REAP)
  • Storm Water Sampling
  • Weekly/Quarterly Inspections
  • Site Audits
  • Annual Reports (Due annually by September 1st)
  • Notice of Termination (NOT)
  • Aerial Photos
  • Notice of Violation (NOV)
  • Sampling Training Classes
    • pH, turbidity, and non-visible pollutant sample collection
  • QSD/QSP Training Classes
  • Construction General Permit Trainer of Record (CGP ToR) for Qualified SWPPP Developer, Qualified SWPPP Practitioner.
  • EnviroCert Certified erosion and Sediment Storm Water Inspector (CESSWI)
  • EnviroCert Certified Instructor for Certified Professional in Erosion & Sediment Control (CPESC), Certified Professional in Storm Water Quality (CPSWQ)